Ozone Bucket Test

A short tutorial on how to perform a bucket test to gain a visual baseline of the ozone coming out of the contact tank of a DRAMMwater ozone skid.

CE-Line: The Benefits of Automated In-Line Nutrient Analysis

Laboratory nutrient testing is labor-intensive, prone to human error, and most of all, time-consuming. However, a groundbreaking solution has emerged: the CE-Line, an automated in-line nutrient analysis unit poised to revolutionize greenhouse management.

Save Labor by Speeding Up Your Hand Watering

Time management in the greenhouse has always been a paramount concern. By choosing high-flow Waterbreakers, valves, and hoses, watering time can be drastically cut down. 

Leaky Wand? Check Your Washers.

If your watering wand has a leak that looks like this, it is time to examine the washer inside. High pressure water flowing through the connection point causes the material to erode.

Checking Pump Rotation

When installing your pumps, pump rotation is important to confirm. Electrical installation can change this rotation.

Buwatec Liner Connection Installation

DRAMMwater installations often include corrugated water tanks from Buwatec. These tanks are assembled on site, and have liners to hold the water. The connection to plumbing is done using a boot or witches’ hat connection built into the liner at the designed location for your tank. This video shows this installation – ensuring a good […]

Calibrating Your ORP Probe

Regularly calibrating your ORP probe will ensure that your ozone system is working accurately. This video discusses calibration and cleaning.